Skip to Content

Foundation kit

https://portal.w5engineering.com/web/image/product.template/4248/image_1920?unique=f616911
Reducing the minimum drop height matters when you need a very low-energy event or fine control near zero height. This base opens up that lower test range and gives the operator much better control over shallow-drop setups.

0.00 0.0 USD 0.00

0.00

Not Available For Sale

This combination does not exist.

Terms and Conditions
Shipping: 2-5 Business Days